News

News

Here we inform you regularly about news in our office

20.12.2024 Christmas Greetings from Orbis Marine Consult

25.10.2021

The new part of the pontoon pier HL 7 at Lübeck's Skandinavienkai makes contact with the Trave for the first time.


In this interesting project, an existing docking pontoon was widened by approx. 8 m. The challenge was the floating assembly of the new part without underwater welding.

We developed the concept in cooperation with our customer, Lübecker Hafen Gesellschaft. Orbis Marine continued to be responsible for the design, construction and construction supervision.


10.05.2021

We have moved, our new address is:


Orbis Marine Consult GbR

Kottwitzstr. 37

23566 Luebeck

Share by: