25.10.2021
The new part of the pontoon pier HL 7 at Lübeck's Skandinavienkai makes contact with the Trave for the first time.
In this interesting project, an existing docking pontoon was widened by approx. 8 m. The challenge was the floating assembly of the new part without underwater welding.
We developed the concept in cooperation with our customer, Lübecker Hafen Gesellschaft. Orbis Marine continued to be responsible for the design, construction and construction supervision.
10.05.2021
We have moved, our new address is:
Orbis Marine Consult GbR
Kottwitzstr. 37
23566 Luebeck